The plant of ArcelorMittal Zenica is located in the Zenica-Doboj canton in the centre of Bosnia and Herzegovina.
The production site of Zenica consists of an integrated plant with a liquid phase (coke oven, sintering plant, blast furnace) and a steel plant. The ore is supplied by the nearby Prijedor Mine.
The plant is unique with facilities including both integrated route and electric arc furnace (investestment in rebar coil for availability early 2016).
Wire rod
Rebar in coil
Rebar in bar
ArcelorMittal Zenica
Bulevar Kralja Tvrtka I, no. 17
72000 Zenica
BOSNIA AND HERZEGOVINA
+387 32 467 000
Website Zenica