For metal deck floors
TAB-Deck™ is a solution for completely replacing the welded mesh in metal decking applications used in multi-storey construction. Steel fibres are hereby contributing as well to the shrinkage control of the concrete as to the bearing capacity in hogging moment areas.
Numerous advantages
- Interesting time savings
- Significantly reduced crane times
- Safer job-sites as workers cannot get trapped by installed mesh
- Reduced storage space required on the ground which is particularly interesting in urban environment
- No heavy storage of welded mesh directly on the installed decking on each storey
Typical fibre dosage rates are from 30 to 35 kg/m³. TAB-Deck™ allows for fire ratings up to two hours. Spans can reach up to 4.5 m in function of the loading, the chosen metal decking profile and the slab thickness.
References
Résidence Tiers Temps La Madeleine, France
- Refurbishment
- Fibre HE+ 1/60
- Dosage 30 kg/m³
Parking CHL, Luxembourg
- Open carpark
- Fibre TABIX 1.3/50
- Dosage 35 kg/m³
Ings Road, United Kingdom
- Social housing
- Fibre HE 1/50
- Dosage 30 kg/m³
Aintree Race course, United Kingdom
- New grandstands and media centre
- Fibre HE 1/50
- Dosage 30 kg/m³
Doncaster Race course, United Kingdom
- New stands
- Fibre HE 1/50
- Dosage 30 kg/m³
Propect park, United Kingdom
- Office building
- Fibre HE 1/50
- Dosage 30 kg/m³
Cardinal Newman College, United Kingdom
- Student housing
- Fibre HE 1/50
- Dosage 30 kg/m³
St Mary Walk Campus East Riding College, United Kingdom
- Education building
- Fibre HE 1/50
- Dosage 50 kg/m³
Quorum Business Park, United Kingdom
- Multiple office buildings
- Fibre HE 1/50
- Dosage 30 kg/m³
River Lights, United Kingdom
- Entertainment complex
- Fibre HE 1/50
- Dosage 30 kg/m³
Hartlepool Healthcare, United Kingdom
- Health centre
- Fibre HE 1/50
- Dosage 30 kg/m³
Selby College, United Kingdom
- Education building
- Fibre HE 1/50
- Dosage 30 kg/m³
Bingley Healthcare, United Kingdom
- Health center
- Fibre HE 1/50
- Dosage 30 kg/m³